The contractor has worked on restoration of turf and landscaping areas disturbed by construction, including the repair of irrigation systems and dog fences. If your system has not been repaired yet, please contact Matt Havlik to get on the list. Late this week or early next week the contractor will begin to raise castings in the roadway to their final elevation. They will cut through the base layer of pavement and adjust manhole castings up slightly in preparation for paving the final layer of pavement. They will mark these castings with paint and cones; please be sure not to drive over them until the final layer of pavement is installed.



Manage Newsletter Preferences